What is a requirement of an FM200 (HFC-227) installation?

What is a requirement of an FM200 (HFC-227) installation?

A.

It is a high-pressure gas; therefore nozzles must be mounted with two brackets.

B.

Drainage system under the raised floor.

C.

Install the gas containers (tanks) close to the data centre.

D.

Install pre-action sprinklers in the same room as the FM200.