Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

You have an Operations Center with two connected Masters.

You have an Operations Center with two connected Masters. You want to start a job on Master B from a fob on Master A. What is the preferred way to accomplish this?

A.

Use the Pipeline build step with the remote path URL argument.

B.

Use the cross team collaboration feature to publish a build notification and subscribe to that notice from Jobs that should run when the notification is published.

C.

Broadcast an e-mail message from the Job on Master A and monitor the e-mail queue from Master B.

D.

Use the "Trigger parameterized build on other projects" post-build step and specify the remote path as project name.

E.

Use the trigger-remote-build CLI command and pass the Job URL as a parameter.

CCJE PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now CCJE pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"