Black Friday Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A study team member suggests that data for a small, 50-patient, 2-year study can be...

A study team member suggests that data for a small, 50-patient, 2-year study can be entered and cleaned in two weeks before lock. Which are important other considerations?

A.

Processing the data in two weeks after the study is over would save money because the data manager would not be involved until the end

B.

Without the ability to capture the data electronically, the data cannot be checked or used to monitor and manage the study

C.

Processing the data in two weeks after the study is over would save money because the EDC system would only be needed for a month

D.

It would take more than two weeks to get second iteration queries generated and resolved

CCDM PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now CCDM pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"