GAQM CBAF-001 Question Answer
What stage of the V model provides the test criteria for user acceptance testing?
The business needs.
The requirements.
The designed solution.
The developed solution.
TESTED 21 Feb 2026
Copyright © 2014-2026 ACE4Sure. All Rights Reserved