Because your grid has network high availability (HA), before going live with the grid, you...

Because your grid has network high availability (HA), before going live with the grid, you want to perform a number of switch failover tests. Which test should you perform to simulate switch

power failure?

A.

Disconnect all cables from one switch for one minute.

B.

Pull all the network cables from one bank of interfaces on the switch.

C.

Pull the power on one switch and leave it offline for at least five minutes.

D.

Access the switch administrative interface and administratively shut the port to disable it.