Which scenario is most desirable during the execution phase of a project?
A.
Apply and use quality controls to ensure expectations are met throughout the project
B.
Communicate quality failures to the sponsor for feedback
C.
Conduct all quality inspections at the end of the project
D.
Only correct quality issues found if it will keep you within the budget
The Answer Is:
A
This question includes an explanation.
Explanation:
According to the PMBOKĀ® Guide, quality should be built into the project during the execution phase rather than inspected in at the end. This aligns with the core philosophy of " Prevention over Inspection. "
Continuous Quality Assurance: The most desirable scenario is to apply quality controls and manage quality throughout the entire lifecycle. This ensures that the work being produced consistently meets the stakeholder expectations and requirements defined in the Quality Management Plan.
Early Detection: By using quality controls throughout the execution, the project team can identify variances early, implement corrective actions, and reduce the overall " Cost of Quality " (CoQ) by avoiding expensive rework later in the project.
Managing Expectations: Regular quality activities provide transparency to stakeholders, demonstrating that the project is on track to deliver the promised value and results.
Why other options are incorrect:
Option B: Communicate quality failures to the sponsor for feedback: While transparency is important, simply reporting failures is a reactive approach. The goal of the project manager is to prevent failures and manage them through defined processes (like the Quality Management Plan) rather than relying on the sponsor to provide a solution for every failure.
Option C: Conduct all quality inspections at the end of the project: This is highly undesirable. If quality issues are only discovered at the end, the cost of rework is at its highest, and the risk of project failure or significant delay is extreme. This contradicts the principle of iterative verification.
Option D: Only correct quality issues if it will keep you within the budget: This is a dangerous approach. Quality is a constraint equal to cost and schedule. Failing to meet quality requirements usually leads to higher costs in the long run (failure costs) and can result in the product being completely unusable, regardless of whether it stayed " on budget. "
CAPM PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"