PMI CA0-001 Question Answer
A Change Control Board should be _______?
flexible
Include the project manager
appropriate authority
al1 of the above
CCB should have all the mentioned characteristics.
TESTED 22 Feb 2026
Copyright © 2014-2026 ACE4Sure. All Rights Reserved