SAP C_TPLM22_67 Question Answer
A costumer uses cross-company-code projects with a top billing element and an additional billing element underneath for each company code. Although the internal billing between the lower-level WBS elements has been performed
correctly, the results analysis summarizes all values to the highest billing elements.
How can we split the results to the different company codes? *