Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A costumer uses cross-company-code projects with a top billing element and an additional billing element...

A costumer uses cross-company-code projects with a top billing element and an additional billing element underneath for each company code. Although the internal billing between the lower-level WBS elements has been performed

correctly, the results analysis summarizes all values to the highest billing elements.

How can we split the results to the different company codes? *

A.

Split the project into different projects according to each company code

B.

Settle the WBS elements to the highest billing element before you do the results analysis

C.

Adjust the customizing of the valuation method in the expert mode of the periodic results analysis accordingly

D.

Change the project structure so that it corresponds better to the company's organizational structure

C_TPLM22_67 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now C_TPLM22_67 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"