What does a work center control? Note: There are 2 correct answers to this question.
A.
Calculation of costs of work performed
B.
Release of production orders
C.
Availability of capacity
D.
Valuation of bill of material components
The Answer Is:
A, C
This question includes an explanation.
Explanation:
In SAP Production Planning (PP), awork centeris a critical master data object that represents a specific location where production operations are performed. It plays a pivotal role in various aspects of production management, including costing, capacity planning, and scheduling. The primary controls associated with a work center are:
Calculation of Costs of Work Performed (A): Work centers are assigned to cost centers and have associated activity types. They utilize formulas to calculate operation costs based on parameters such as machine time and labor. This setup enables precise determination of production costs.
SAP Learning
Availability of Capacity (C): Work centers define available capacities, including labor and machine capacities. They store data and formulas necessary to calculate capacity requirements for operations, facilitating effective capacity planning and ensuring that production resources are optimally utilized.
SAP Learning
Regarding the other options:
Release of Production Orders (B): The release of production orders is managed at the order level and is not directly controlled by work centers.
Valuation of Bill of Material Components (D): The valuation of components in a Bill of Materials (BOM) is determined by material master data and valuation classes, not by work centers.
C_IEE2E_2404 PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"