The variable overhead efficiency variance is:
The same as the direct labour efficiency variance
The difference between the actual hours worked and the standard hours produced, multiplied by the variable overhead absorption rate
The difference between the actual variable overheads incurred and those absorbed
The actual hours worked multiplied by the variable overhead absorption rate