A cost-effective system integration design MUST balance:
A.
Insurance and operational costs
B.
Fire safety and security objectives
C.
Human resources and hardware utilization
D.
Risk and control assessments
The Answer Is:
D
This question includes an explanation.
Explanation:
Comprehensive Detailed Explanation:
A cost-effective system integration design must balance the level of risk with the controls implemented to mitigate that risk. This balance ensures that resources are used efficiently while maintaining acceptable protection levels.
A, B, and C are relevant considerations, but only D represents the fundamental balance in security system design.
[References:, PSP Study Guide – Security System Design and Risk-Based Planning, POA Manual – Cost-Effective Security Integration Principles, , ]
ASIS-PSP PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"