The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C.
The Attach Block should be enlarged to also include the Waited Long Enough decision stage.
D.
The flow contains a recover stage and a route from it without a resume stage. This will cause internal errors on future exceptions thrown in the same session.
E.
The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
The Answer Is:
A
AD01 PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 60% Discount on All Products,
Use Coupon: "8w52ceb345"