Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

Consider the following process flow:What is the problem with this flow?

Consider the following process flow:

What is the problem with this flow?

A.

There is nothing wrong with this flow.

B.

The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly

C.

The Attach Block should be enlarged to also include the Waited Long Enough decision stage.

D.

The flow contains a recover stage and a route from it without a resume stage. This will cause internal errors on future exceptions thrown in the same session.

E.

The 0.5 second wait stage should be removed so that the retries can be performed at full speed.

AD01 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now AD01 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"