A proprietary field-glued mass timber beam splice requires special inspection because the connection relies on a field-applied adhesive process that is not covered as a routine prescriptive mass timber connection in Table 1705.5.3. The controlling mechanism is IBC Section 1705.1.1, which authorizes the building official to require special inspection for unusual materials, systems, or installation procedures, particularly where compliance depends on additional manufacturer installation instructions.
The ICC code-development rationale for the tall mass timber provisions specifically identifies field-glued mass timber beam or panel splices as an example of work for which special inspection can be required. Inspection must address the approved evaluation report and manufacturer’s instructions, including substrate preparation, moisture and temperature limits, adhesive storage and expiration, mixing or proportioning, application quantity, open time, member alignment, clamping or pressure, and curing conditions.
Approval by the permit applicant has no regulatory significance. Verification by the registered design professional may supplement the inspection program but does not replace the approved special inspector. A building official may observe the work, but routine field verification by that official is not the prescribed quality-control procedure.
References/Topics: 2021 IBC Sections 1704.2, 1704.3 and 1705.1.1; special cases; proprietary field-glued mass timber splices.
===============