As a part of a network hardware refresh project, all the network switches have been...

As a part of a network hardware refresh project, all the network switches have been replaced with a newer, high-performance model. After the replacement, the company users started experiencing slowness on the applications hosted on their vSAN-backed VMs.

The vSAN administrator checked the vSAN Network Health status and noticed that the "Hosts large ping test" has failed.

What could be the cause of this performance degradation issue?

A.

MTU 9K is not configured on the hosts vSAN vMKernel ports.

B.

MTU 9K is not configured on the hosts VMnic ports.

C.

MTU 9K is not configured on the ToR switch.

D.

MTU 9K is not configured on the vDS switch.

5V0-21.21 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 5V0-21.21 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"