Halloween Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

Click on the exhibit below.

Click on the exhibit below.

A new router named PE-D is to be directly connected to PE-C and is required to be added to the existing VPLS 300. The design requires the least amount of signaling, the least amount of configuration changes for existing sites and the new site has to have access to all existing sites. How should the new site be added to VPLS 300?

A.

Configure a mesh-sdp between all existing PE routers and the new PE router

B.

Configure a mesh-sdp between PE-C and PE-D

C.

Configure a spoke-sdp between PE-C and PE-D.

D.

It is not possible to meet the design requirements.

4A0-C02 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 4A0-C02 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"