Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.

An architect is responsible for the lifecycle management design for a brownfield vSphere-based solution.

The following information has been provided during initial meetings around the new solution:

Existing heterogeneous server hardware will be used to provide the hosting platform.

The available hardware is:

-- 10 servers that contain 2 x 20-Core Intel Xeon processors and 512 GB RAM from Vendor A

-- 10 servers that contain 2 x 24-Core Intel Xeon processors and 768 GB RAM from Vendor A

-- 20 servers that contain 2 x 16-Core AMD EPYC processors and 512 GB RAM from Vendor B

-- 10 servers that contain 1 x 24-Core AMD EPYC processors and 256 GB RAM from Vendor C

All of the hardware is currently listed on the VMware Hardware Compatibility List (HCL).

All existing server hardware has 36 months vendor support remaining.

The requirements from the customer are:

REQ001 - The solution must support the hosting of 5,000 workloads across two physical sites.

REQ002 - The solution should minimize the number of clusters.

REQ003 - The solution must ensure that there is no impact to service when completing upgrades.

Given the resource requirements needed for the solution, the architect has calculated that all of the existing servers will be required to provide sufficient resources for the new environment. The Intel-based servers will be deployed to the primary site and the AMD-based servers will be

deployed to the secondary site.

Which four additional design decisions should the architect make to ensure all requirements can be met? (Choose four.)

A.

The solution will create an Intel-based 20-node vSphere cluster in the primary site and an AMD-based 30-node vSphere cluster in the secondary site.

B.

The solution will use VMware SDDC Manager to perform lifecycle management of the solution.

C.

The solution will ensure each vSphere cluster supports a minimum of N + 1 redundancy.

D.

The solution will use vSphere Lifecycle Manager images to update and upgrade vSphere ESXi hosts in the secondary site.

E.

The solution will use vSphere Lifecycle Manager baselines to perform patching and upgrading of vSphere ESXi hosts in the secondary site.

F.

The solution will use vSphere Lifecycle Manager images to update and upgrade vSphere ESXi hosts in the primary site.

G.

The solution will ensure each vSphere cluster is configured with Distributed Power Management (DPM).

3V0-21.23 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 3V0-21.23 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"