Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

An architect is responsible for extending the hosting design for a customer.

An architect is responsible for extending the hosting design for a customer. The customer has a mission-critical 3-node application which is load balanced in an active/active/passive configuration. The application administrator requests that the virtual infrastructure team be responsible for maintaining platform level availability. An organizational policy exists to mandate the highest possible availability for mission-critical applications.

Based on the resource requirements, the architect has made the following design decision:

The target vSphere cluster contains three VMware ESXi host servers

A combination of which additional four physical design decisions should the architect make to maximize availability of the application? (Choose four.)

A.

The solution will create a VM-Host Affinity rule that specifies that workloads must run on hosts in a group.

B.

The solution will enable vSphere High Availability (HA) with restart priority set to "Highest" for the application virtual machines.

C.

The solution will create a VM-VM Affinity rule to keep virtual machines separate.

D.

The solution will create a host DRS group containing all hosts within the cluster.

E.

The solution will enable vSphere Fault Tolerance with vSphere High Availability (HA) virtual machine component failure enabled.

F.

The solution will create a virtual machine DRS group that contains all of the critical application workloads.

G.

The solution will create a VM-VM Affinity rule to keep virtual machines together.

3V0-21.23 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 3V0-21.23 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"