What occurs during a scheduled electronic programmable logic device (EPLD) update of a Cisco fabric...

What occurs during a scheduled electronic programmable logic device (EPLD) update of a Cisco fabric switch supervisor module?

A.

All traffic through the system is stopped for the duration of the update, and the switch is power cycled after the upgrade is complete.

B.

All control plane traffic is stopped for the duration of the update, and the switch remains operational for the duration of the upgrade.

C.

The redundant supervisor module takes over for the duration of the update, there is no service disruption.

D.

The redundant supervisor module takes over for the duration of the update, and the switch is rebooted after the upgrade is complete.

350-601 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 350-601 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"