Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

Refer to the exhibit.

Refer to the exhibit. An engineer must configure infrastructure monitoring in a Cisco UCS domain to monitor traffic on the Cisco fabric interconnect A and Cisco fabric interconnect B port links connected to Cisco MDS switches SW1 and SW2. The monitored traffic must be sent to Cisco Intersight at 20 Gbps for further analysis. Which command must be run on a UCS device after the create eth-mon-eession EthMonitor1/0 command is run?

A.

set direction transmit

B.

create fc-mon-session storage

C.

set speed 20gbps

D.

create dest-interface 1 1

350-601 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 350-601 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"