New Year Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac75sure

Refer to the exhibit.

Refer to the exhibit. A network engineer with an employee ID 4379:43:595 is setting up an IS-IS network with these requirements:

    Routes with a tag of 80 and IP prefixes other than 192.168.10.20/24 must be redistributed from Level 1 into Level 2.

    Route leaking must be configured from Level 2 into the Level 1 domain for routes that are tagged with only 50 or 40.

Which configuration must be implemented on RB to meet the requirements?

A.

Add match tag 80 in route-map Ieak2-1

B.

DUMPS Add match ip address 152 in route-map redist1-2

C.

Remove match tag 40 from route-map Ieak2-1

D.

Change match tag 80 to match tag 50 in route-map redist1-2.

350-501 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 350-501 pdf
Get 75% Discount on All Products, Use Coupon: "ac75sure"