A Cisco UCS C885A M8 server contains a GPU sled configured with six power supply...

A Cisco UCS C885A M8 server contains a GPU sled configured with six power supply units (PSUs) in an N+2 redundancy configuration. The workload on the GPU sled is currently drawing a load of 4500W.

Using Power Save Mode, how many PSUs can be placed into standby mode to improve power efficiency without compromising redundancy?

A.

0

B.

1

C.

2

D.

3