Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

Refer to the exhibit, An engineer is deploying a Cisco ACI environment but experiences a...

Refer to the exhibit, An engineer is deploying a Cisco ACI environment but experiences a STP loop between switch1 and switch2. Which configuration step is needed to break the STP loop?

A.

Configure the STP instance to VLAN mapping under the switch STP policy.

B.

Configure a Layer 2 external bridged network on the interfaces facing the MST switches.

C.

Enable the native VLAN on the interfaces facing the MST switches using static pons in a dedicated EPG.

D.

Enable BPDU filter under the STP interface policy on the Interfaces lacing the MST switches.

300-620 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 300-620 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"