Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

An engineer plans a Cisco ACI firmware upgrade.

An engineer plans a Cisco ACI firmware upgrade. The ACI fabric consists of three Cisco APIC controllers, two spine switches, and four leaf switches. Two leaf switches have 1-Gb copper s for bare metal servers, and the other two leaf switches have 10-Gb SFP ports to connect storage. Which set of actions accomplishes an upgrade with minimal disruptions?

A.

Upgrade the APIC controllers by selecting the desired firmware and choosing Upgrade Now.

Divide the switches into two upgrade groups: spines and leaves.

Start the firmware upgrade on the spine upgrade group and then proceed with the leaf upgrade group.

B.

Upgrade the APIC controllers by initiating the upgrade process that uses the most recent uploaded firmware.

Divide the switches into three upgrade groups: spines, 1-Gb switches, and 10-Gb switches.

Start the firmware upgrade on the spine upgrade group and then proceed with the other two groups.

C.

Upgrade the APIC controllers by selecting the desired firmware and choosing Upgrade Now.

Divide the switches into two upgrade groups with one spine, one 1-Gb switch, and one 10-Gb switch per group.

Start the firmware upgrade on the first upgrade group and when it finishes, start the second upgrade group.

D.

Upgrade the APIC controllers as a single group by selecting the firmware and choosing Upgrade Now.

Divide the switches into four upgrade groups with one switch per group.

Start the firmware upgrade on each upgrade group in succession until all four are complete.

300-620 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 300-620 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"