Pre-Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A maintenance operation on power rail A caused a reboot of the servers in a...

A maintenance operation on power rail A caused a reboot of the servers in a Cisco UCS B-Series chassis. The Cisco UCS system has these attributes:

* The system is equipped with four PSUs.

* N+1 mode is used.

* PSU 1 and 2 are connected to rail A.

* PSU 3 and 4 are connected to rail B.

Which action prevents server reboot when rail A goes down?

A.

Configure nonredundant mode with PSU1 and 3 on A and PSU2 and 4 on B.

B.

Use GRID mode; do not change physical plugs.

C.

Configure N+1 mode with PSU1 and 2 on B and PSU3 and 4 on A.

D.

Use N+2 mode; do not change physical plugs.

300-615 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 300-615 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"