Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

A network consultant must design a high availability interconnection of a clustered Cisco UCS Fabric...

A network consultant must design a high availability interconnection of a clustered Cisco UCS Fabric Interconnect toward two upstream Layer 2 switches. The Ethernet interconnection must use all redundant links and have no impact on the STP domain size.

Which connectivity solution must be used?

A.

Cisco UCS Fabric Interconnect in switch mode with dual uplinks distributed evenly to the upstream switches

B.

Cisco UCS Fabric Interconnect in switch mode with a single uplink toward each upstream switch to eliminate any change to the STP domain size

C.

Cisco UCS Fabric Interconnect in end host mode with a single uplink toward each upstream switch to eliminate any change to the STP domain size

D.

Cisco UCS Fabric Interconnect in end host mode with dual uplinks distributed evenly to the upstream switches

300-610 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 300-610 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"