VMware 2V0-13.25 Question Answer
Constraint: Existing stretched cluster model must be used.
Requirement: Minimize management infrastructure downtime.
Which Supervisor deployment model supports the design?
VMware 2V0-13.25 Question Answer
Constraint: Existing stretched cluster model must be used.
Requirement: Minimize management infrastructure downtime.
Which Supervisor deployment model supports the design?