Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A customer is deploying VCF at a new datacenter location.

A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration. Which of the following should be a documented risk?

A.

Six months may not be enough time to complete the migration.

B.

There will be connectivity between the two locations.

C.

Bandwidth between the two locations is sufficient to accommodate the workload migration.

D.

Workloads will be powered off during migration.

2V0-13.24 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 2V0-13.24 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"