Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

Refer to the exhibit.

Refer to the exhibit.

Traffic from R1 to the 10.10.2.0/24 subnet uses 192.168.1.2 as its next hop. An network engineer wants to update the R1 configuration so that traffic with destination 10.10.2.1 passes through router R3, and all other traffic to the 10.10.20/24 subnet passes through r2. Which command must be used?

A.

Ip route 10.10.2.1 255.255.255.255 192.168.1.4 115

B.

Ip route 10.10.2.0 255.255.255.0 192.168.1.4 100

C.

Ip route 10.10.2.0 255.255.255.0 192.168.1.4 115

D.

Ip route 10.10.2.1 255.255.255.255 192.168.1.4 100

200-301 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 200-301 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"