Cisco 200-301 Question Answer
Refer to the exhibit.
A new VLAN and switch are added to the network. A remote engineer configures OldSwitch and must ensure that the configuration meets these requirements:
• accommodates current configured VLANs
• expands the range to include VLAN 20
• allows for IEEE standard support for virtual LANs
Which configuration on the NewSwitch side of the link meets these requirements?
A)
B)
C)
D)
Previous