Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

Refer to the exhibit.

Refer to the exhibit.

The following must be considered:

• SW1 is fully configured for all traffic

• The SW4 and SW9 links to SW1 have been configured

• The SW4 interface Gi0/1 and Gi0/0 on SW9 have been configured

• The remaining switches have had all VLANs adde d to their VLAN database

Which configuration establishes a successful ping from PC2 to PC7 without interruption to traffic flow between other PCs?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

200-301 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 200-301 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"