Oracle 1z0-1059-24 Question Answer
What does a Variable Consideration require?
an estimate of the consideration be made at inception only
that the consideration be monetary
an estimate of the consideration be made at Inception, and corrections of the accrual at made at each period end until revenue Is recognized
a disclosure be made to the shareholders
https://cloud.oracl e.com/opc/saas/RevMgmt/r12/wn/r12-revenue-wn.pdf(p.15)
TESTED 11 Jul 2025
Copyright © 2014-2025 ACE4Sure. All Rights Reserved