Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

Your client is involved in automation control systems installation.

Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified thattheir cost spread distribution factor on a 10 spread point scale resembles:

0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. (Choose two)

A.

Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to a project template.

B.

Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to the resource class.

C.

Use the predefined Bell Curve spread with small deviations on the spread points.

D.

Use the predefined S-Curve spread with small deviations on the spread points.

1z0-1057-24 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 1z0-1057-24 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"